Important information (UPD 07.12.2022) »Author’s repaki from Elchupacabra – Repack download

Repaki from Elchupacabra

Important information (UPD 07.12.2022)

Dear friends!

Due to the difficult situation in the homeland of Maxim in the city of Kherson, as well as due to the lack of the possibility of Internet access, work on repaks temporarily suspended.

From the 22nd, the Internet has disappeared throughout the city. Let’s hope that all this is not for long.

I ask everyone to treat understanding.

UPD 25.10.2022 (Oldmir)

Somehow they could send me a voice message from Maxim. What can I convey from his words …

1. At the moment, it is not known when he has the Internet, it is possible that it will drag on for a long time.

2. Work on the site and repaki will continue as soon as everything is getting along. Nobody plans to throw the site.

3. All patrons of participation in the group will be extended for the period of a forced stop in the work. You can see the deadlines for the end of participation in the group of the philanthropist in your profile. If someone has a term already coming to an end, write to me in Personal messagesI will extend.

4. To everyone who wants and can support Maxim, financially during this period (you yourself understand how he is with finances now) can help him On the Donat page. Accordingly, premium access to the site will also be opened for them, and after the appearance of Maxim, this period will also be extended for the term of the forced stop in the work.

Be sure to send screenshots of payment to me, OldMir, through Form back communication (It is possible to attach the file to the letter). Or you can write to me on the issue of translations through Personal messagesI will provide for this time my details for payment.

UPD 30.11.2022 (Elchupacabra)

Greetings to everyone who was waiting.
To dwell on a sad story, how 3 weeks lived in the city without electricity, water, heating, communications and the Internet and under shelling, I think it does not follow, all my problems are enough, and mine are far from completion.
Now in another city, I’m trying to return to work on the project a little. The main problem is the same – electricity. I am thinking about the rationality of the purchase of a laptop to work in a shopping center provided by the generator, because even here the previous shutdown was pulled for 40 hours, and today I did not have time to publish some repaki and this was forced to postpone 8 hours.

Directly at the work of the site.
1. For some time, the renewal of the repacks will be several non -systemic (old/new, possible breaks in publications). Notifications in the comments on the release of new versions for this period are not particularly welcome.
2. All debts on the premium translations in the premium will be certainly completed (I apologize to everyone for their delay due to force majeure). Claims for the extension of the premium for the “missing” month are accepted in drugs (Elchupacabra).
3. Stable work (as it was before 10.22.2022) unfortunately I can’t guarantee (for reasons beyond my control), but I will try to make this resource continue to be useful to users.

UPD 07.12.2022 (Elchupacabra)

After missile shelling 05.12.2022 two days without electricity.
Again there was a composed simple with updates (alas, most likely not the last).


PS I will open comments on this post only in the daytime. I ask everyone to observe the rules of the site and not make any stuffing non -peaceful nature. Violators and especially stubborn will lose the right to comment on the site, or go to the ban.
As an option, I will completely close the commenting of this post in case of complete ignoring this warning.

I hope for your understanding.